COST AND SCHEDULE OVERRUN IN CONSTRUCTION PROJECTS

Abstract View PDF Download PDF

##plugins.themes.academic_pro.article.main##

Shraddha P. Raut
Vikram S. Gohatre
Piyush V. Kolhe

Abstract

In construction industry time and cost performance is the fundamental criteria for success of any project.Unfortunately construction industry facing poor performance leading to failure in achieving effective time and cost performance. Therefore to complete the project on time it is necessary to reduce the causes which are responsible for time & cost overrun. The aim of the study is to analyze the construction projects to determine construction cost and schedule
overrun in various types and size of the projects. Number of samples were collected and analyzed to find various factors responsible for the cost and schedule overrun. This study will help the practitioners to implement the mitigation measure at planning stage in order to achieve successful construction project. The aim of the study is to establish significant causes of cost escalation, schedule overruns and propose mechanisms that could be used to systematically address the causal factors.

##plugins.themes.academic_pro.article.details##

How to Cite
[1]
Shraddha P. Raut, Vikram S. Gohatre, and Piyush V. Kolhe, “COST AND SCHEDULE OVERRUN IN CONSTRUCTION PROJECTS”, IEJRD - International Multidisciplinary Journal, vol. 4, no. 4, p. 6, May 2019.

Most read articles by the same author(s)

Obs.: This plugin requires at least one statistics/report plugin to be enabled. If your statistics plugins provide more than one metric then please also select a main metric on the admin's site settings page and/or on the journal manager's settings pages.